Primavera P6 Scheduler
Indianapolis, IN 
Share
Posted 2 months ago
Job Description
Summary

For us, "family" doesn't describe our size or capabilities, rather it's a way of doing business.

It means we put people first. From our committed and dynamic safety culture, to the way we treat our employees and clients, to how we interact with project stakeholders on a daily basis, our focus on people allows us to achieve our goal of doing a good job, and doing it with integrity.

We offer a comprehensive benefits package to include:

Competitive Compensation
Health Insurance
Vision & Dental
Health Savings Account
Flexible Spending Accounts
Short- and Long-Term Disability
Life Insurance
401(k)

Position Responsibilities
The Primavera P6 Scheduler is responsible for working closely with the Senior Scheduler and the Cost Controls Manager to execute the planning and scheduling of logistics, budgets, and all other facets of a construction project. Duties and Responsibilities include (but are not limited to):

  • Update master schedule, including but not limited to resource loading such as manpower and equipment loading, to establish sequence and lead time
  • Analyze construction data and perform mathematical calculations to determine material, tools, and human resource requirements for the schedule
  • Plan sequence of operations for guidance of staff and craft construction workers
  • Analyze gaps between the planned and actual progress and highlight the areas of concern
  • Assist with preparation, maintain, and update schedules; identify critical activities
  • Work closely with the management team, client, subcontractors, and team members to communicate required completion dates and interface between functional, operational, and project teams
  • Other duties as assigned
  • Education
    Bachelors Degree
    Position Requirements
  • BS in Engineering, Construction management, or related discipline and/or equivalent related work experience required
  • Must be familiar with Primavera P6 Software
  • Experience in the construction industry is a plus
  • Training
  • On the job, compliance, and safety
  • Equal Opportunity Statement
    IEA, and our family of companies, is an Equal Opportunity / Affirmative Action employer. We consider all qualified applicants for all positions without regard to race, color, religion, gender, national origin, age, disability or any other legally protected status. We also comply with all applicable laws governing employment practices and do not discriminate on the basis of any unlawful criteria.

    MasTec, Inc. is an equal employment opportunity employer. The Company's policy is not to unlawfully discriminate against any applicant or employee on the basis of race, gender, sex, sexual orientation, gender identity, color, religion, national origin, age, disability, genetic information, veteran status or any other consideration made unlawful by applicable federal, state, or local laws. The Company also prohibits harassment of applicants and employees based on any of these protected categories. It is also MasTec's policy to comply with all applicable state, federal and local laws respecting consideration of unemployment status in making hiring decisions.

     

    Job Summary
    Start Date
    As soon as possible
    Employment Term and Type
    Regular, Full Time
    Required Education
    Bachelor's Degree
    Required Experience
    Open
    Email this Job to Yourself or a Friend
    Indicates required fields